Error occurred in deployment step 'Add Solution': Attempted to perform an unauthorized operation.

Received this error today when trying to create a SharePoint solution against a newly created site.


My first problem was the site was configured to use a port which was already used by another web site. Therefore the site could not start at all.

In my case both Default Web Site and SharePoint - 2000 was both using port 2000. Changing the port of Default Web Site and I was able to start the site.

However now I still received the same error message. When browsing the site I realized I did not have access to the site.

Giving access to my user and I was able to deploy the solution.

To sum up this post:
 - Check the site can start
 - Check the site can be browsed
 - Check your user have access to the site

Comments

Popular posts from this blog

Azure DevOps - Gantt Chart

It's been a while since my last post - in the past couple of weeks I have played around with some videos of topics I find interesting. One of these topics are a very cool way of displaying a Gantt Chart upon your Azure DevOps board's. Check it out here!

How to integrate MS Planner in MS Roadmap (Gantt chart)

Hi, It is no secret i am exited about the new Roadmap service from Microsoft. Even though only limited features have been released I beleive Roadmap and the new Project home have great potential. Anyway, check out my video on how to connect Planner into Roadmap with Microsoft Flow.

Project online sync to Outlook

Project online sync to Outlook Ever since the "Sync to Outlook" button have been disabled I have looked for other ways to do this. The other day I found a way for a project manager to do this - it requires a little bit of configuration though. In the following we will create a calendar for one project and have the team members connect to that project. SharePoint calendar On your project site create a new calendar. Give it the same name as your project. Flow -> As a project manager go to Flow and create a new blank flow: https://emea.flow.microsoft.com/  Insert a new trigger of the type "When a new task is created". Type in your PWA URL. Insert a new condition and configure it match your project name. If the condition is not met let the flow exit without any further steps. If the condition is met configure the flow to create a new SharePoint list item and chose your calendar as the list. Set the start, end and title t...